βš™οΈ Manufacturing & BOM ERP πŸ“‹ Shop-Floor Job Cards πŸ”’ Automated Accounting Sync

Streamline Shop-Floor Manufacturing & Job Costing

Eliminate shop-floor bottlenecks, control batch costs, and guarantee on-time delivery. ERPPWA unifies multi-level Bills of Materials (BOM), department-wise Job Cards, subcontractor delivery notes, WIP material issues, and actual unit costing.

Schedule Guided Demo →
βœ” Multi-Level BOM & Routing Templates
βœ” Exact Unit Costing Material + Labor + Overhead
βœ” Fully Customized
● Shop-Floor Workstations Synced
⚑ Actual Costing: Materials + Labor + Overhead
erppwa.com • Production & Shop-Floor Operations
Shop-Floor Production Operations ERPPWA Production Management SaaS UI

Production & Shop-Floor Operations Audio Overview

Hear how ERPPWA unifies multi-level BOMs, Job Cards, department routing, machine scheduling, and actual batch costing.

0:00 / 2:34
Multi-Level BOM & Routing
Digital Job Cards
Shop-Floor SRM Issue
Subcontractor DNO / DNI
Actual Batch Costing
📖 Read Briefing Summary & Transcript

Audio Summary: This briefing explains how ERPPWA Production Management unifies multi-level Bills of Materials (BOM), department-wise Job Cards, shop-floor SRM issues, subcontractor challans, and real-time manufacturing costing into a closed-loop execution system.

Key Topics Covered:

  • Multi-Level BOM & Engineering Revisions: Structuring sub-assemblies, scrap percentages, and alternative raw materials with version locking.
  • Digital Job Cards & Routing: Releasing sequential department operations, target cycle times, and operator assignment across factory stages.
  • Shop-Floor Material Issues (SRM): Verifying raw material consumption against BOM standards in real time to stop shop-floor leakage.
  • Subcontractor Challans (DNO/DNI): Tracking outsourced processes, vendor scrap returns, and processing fees without inventory discrepancies.
  • Actual Batch Costing: Consolidating material consumption, machine hour overheads, and operator labor for exact unit cost profitability.
🏭 Connected Shop-Floor Operations

Production Management Software for Manufacturers

Plan production jobs, BOM materials, shop-floor processes, quality checks and actual manufacturing costs in one connected ERP

ERPPWA Production Management is manufacturing ERP software for managing production jobs, Bills of Materials (BOM), shop-floor processes, job-based material purchasing, employee tasks, quality checks and actual production costs. It connects these operations directly with purchasing, inventory, and finance while keeping each production job's work and expenses completely visible in real time.

When manufacturing moves from a customer requirement to the factory floor, managers need more than a simple job number. They need to know which assemblies must be made, which materials are available, what process comes next, who is working on it, how long it may take, and what the finished product actually costs.

⚑ Production Management at a Glance

Standard & Custom Jobs Separate production jobs with job-specific BOM & process adaptability
Material Shortage Visibility Live Total, Used, Required, Order/Excess, and Buy quantity visibility
Shop-Floor Execution Assigned department tasks with the start/pause/continue My Jobs timer
Quality & Rework Job checklists, optional QC completion locks, and dedicated rework stages
Exact Actual Costing Materials + Labour + Machine Hours + Outside Services + Job Expenses
Partial Production Record finished goods in stages without forcing premature job closure
Start Your 20-Day Free Trial →
⚑ Production Control Benchmarks
100%
Job Material Visibility
Actual
Batch vs Estimated Cost
Live
Department WIP Tracking
Multi-Level
Subjob Cost Roll-Up
ERPPWA :: Production & Job Dashboard Live Shop-Floor Sync
ERPPWA Production Management Cockpit
βœ” Multi-Level Subjob Nesting: Break machines into subassemblies with cost transfer
βœ” Digital Job Cards: Department tracking with live work timers
βœ” 100% Tally & Finance Sync: Raw material consumption & cost ledger sync
⚠️ Operational Challenges Solved

Common Manufacturing Challenges & What ERPPWA Helps You Do

Manufacturing is a high-stakes balance of materials, machinery, operator hours, and strict delivery dates. Explore how ERPPWA turns daily shop-floor friction into synchronized precision.

πŸ“‹

1. Production Jobs Hard to Plan Accurately

A manufacturing plan involves multiple assemblies, raw materials, and processes. ERPPWA begins with a Product Master BOM, then lets you create a dedicated production job containing customized routing details without modifying the original master template.

πŸ”

2. Material Requirements Scattered Across Sheets

The Job Dashboard shows live Required, Used, Available, Order/Excess, and Buy quantities alongside process stages. Managers inspect upcoming materials and generate RFQs or Purchase Orders directly for shortages before work stops.

⏱️

3. Managers Cannot Tell Where Work Is Delayed

Job process cards show the active workstation, operator, estimated vs. spent hours, priority, and real-time status. Jobs by Department groups shop-floor work into clear department columns; authorized supervisors can put jobs On Hold or reassign tasks in seconds.

πŸ’°

4. Actual Costs Difficult to Compare With Estimates

ERPPWA records planned material and process costs, then automatically captures actual material issues (SRM), labor hours, machine-hour rates, subcontractor charges, and job vouchers. Compare planned vs. actual manufacturing cost side-by-side.

πŸ› οΈ

5. Rework & Defects Introduce Hidden Expenses

Record rejected, rework, and scrap quantities explicitly. Dedicated - Rework process stages record extra operator time and material instead of burying costs. When enabled, QC checklist controls prevent closing a job with open defects.

🚚

6. Outside Machining & Job Work Hard to Track

Link external operations through Delivery Note Out (DNO) when parts leave for outside plating or turning, and Delivery Note In (DNI) when they return. Service charges integrate via Service Purchase Invoices to reflect true batch cost.

πŸ“±

7. Workers & Managers Use Disconnected Records

My Jobs shows each employee their assigned tasks. Start, pause, and continue timer controls capture work time without messy retrospective estimates. Process messages keep dated notes and instructions attached directly to the active operation.

πŸ“¦

8. Finished Quantities & Costs Visible Too Late

Generate partial Finished Goods (FG In) vouchers as batches come off the line. ERPPWA recalculates manufacturing unit costs and updates inventory immediately, allowing sales dispatches to proceed without waiting for full job completion.

πŸ”„ Connected Flow

How ERPPWA Connects Production With Your Factory Floor

From initial product engineering and BOM scoping to shop-floor issue, subjob assembly, finished goods entry, and cost audit:

Step 01 πŸ“¦

Define Products & Create Manufacturing Job

Maintain a master BOM with raw material standards and routing templates. When initiating a job, ERPPWA imports configured BOM items and processes. Set target batch quantities, Sales Order cross-references, warehouse, and due dates. Adapt custom BOMs without modifying the master product template.

Step 02 βš™οΈ

Break Complex Production Into Subjobs

Manage independently manufactured sub-assemblies as linked subjobs. Complete each subjob, calculate its inspected unit cost, and automatically transfer the finished assembly into the parent job as a staging material. Perfect for machinery, electrical panels, and assembled equipment.

Step 03 πŸ“Š

Review Material Readiness & Procurement

The Job Dashboard process list monitors operations alongside live inventory. Inspect Total Required, In-Stock, and Buy quantities. Generate supplier RFQs or Purchase Orders directly from job BOM shortages to keep procurement synchronized with machine schedules.

Step 04 πŸ”„

Issue Materials (SRM) & Execute Processes

Select materials from Pick and generate Shopfloor Requisition Movement (SRM) vouchers to transfer stock to WIP. Operators log in to My Jobs, consult attached drawings, and capture live process hours via the built-in timer.

Step 05 🏭

Quality Checks, Outside Work & Rework

Validate digital QC checklists with photo evidence and test parameters. Track outside subcontracting with Delivery Note Out (DNO) and In (DNI). If parts require correction, route them through dedicated Rework processes to isolate extra machining costs.

Step 06 πŸ“ˆ

Finished Goods Receipt & Actual Batch Costing

Generate Finished Goods In vouchers for inspected quantities to update inventory immediately. Compare estimated vs. actual manufacturing cost (Materials + Operator Time + Machine Hours + Subcontractor Bills). Post valuation ledgers to Financials without manual reconciliation.

πŸ› οΈ Modular Architecture

Key Production Management Capabilities

Explore how ERPPWA unifies every facet of custom and serial manufacturing operations under one single pane of glass.

πŸ“Š

Job Orders & 360 Dashboards

Create and track jobs with customer context, batch size, target delivery dates, and status. Filter job cards by priority and monitor estimated vs. actual costs in real time.

βš™οΈ

BOM, Processes & Subjobs

Import Product Master BOMs as a baseline, configure job-specific overrides, and break complex equipment into subjobs with automatic cost roll-up.

πŸ›’

Material Planning & Procurement

Review job-wide shortages and process-specific needs. Trigger RFQs, Purchase Orders, and inspect supplier quotes directly from the job screen.

⏱️

Shop-Floor Work Execution

Organize processes by department, adjust priorities dynamically, and empower operators with the My Jobs start/pause/continue mobile work timer.

🏭

Machine Capacity & Serials

Log machine models, availability, maintenance logs, and hourly electricity/operating rates. Select machine IDs and part serial numbers as operations begin.

βœ…

Quality, Rework & Scrap

Enforce mandatory QA inspection checklists, record photo attachments, isolate scrap quantities, and create explicit rework routing stages.

🚚

Outside Machining (DNO/DNI)

Track parts sent to subcontractors with Delivery Note Out (DNO) and incoming Delivery Note In (DNI), seamlessly capturing outside job work costs.

πŸ’΅

Job Finance & Partial FG

Post material and labor expenses to general ledgers, compare actual manufacturing unit cost against targets, and create partial Finished Goods in stages.

πŸ“

CAD Drawings & Communication

Attach engineering drawings, spec sheets, and work instructions directly to jobs or operations. Use timestamped process messages for clean shop-floor coordination.

Ready to Modernize Your Shop Floor?

Connect Job Planning, Shop-Floor Tracking & Unit Costing

Claim 20-Day Free Trial →
01

1. Production Job Creation and Master List

Verified ERP Capability

Maintain production jobs as separate manufacturing records. Job setup includes a structured job prefix/number/suffix, job date, due date, customer, relevant Sales Order context, finished product, quantity, source warehouse, category and status. The job editor provides a shortcut to the Finished Goods workspace.

  • βœ“Search and filter job cards by identifier, status and related text.
  • βœ“Open a selected job for one-screen access to processes, materials, estimates and related transactions.
  • βœ“Define quantity and due date for a production batch, including a batch planned to meet combined demand for several orders of a standard product.
  • βœ“Create customised jobs with details that may not be present in the Sales Order.
  • βœ“Update job status manually and maintain the work over additional production cycles when needed.

Important: Jobs are not generated automatically from Sales Orders. Exact many-to-many Sales Order document linking is not established by the current screenshots.

<a id="feature-02"></a>

Integrated Module: Production & Shop-Floor Operations
02

2. Job Dashboard β€” Production 360 Workspace

Verified ERP Capability

The main Job Dashboard brings together the selected job's identity, status, customer and product, target quantity, due date, cumulative estimated hours, overall progress, process timeline, materials and cost summaries.

It displays navigation to connected operational views: Documents, Checklist, Pick, Purchase Requisition (PR/PRI), RFQ, Purchase Orders, Purchase Order Items, GRN, Goods Received (GR), SRM, SRMI, Incomes, Expenses, DN, DNI and Scrap.

  • βœ“Review estimated and actual manufacturing costs in adjacent summaries.
  • βœ“View job-specific process statuses, assignments and estimated/spent hours.
  • βœ“Search job records and navigate to related procurement, inventory and financial entries.
  • βœ“Open print actions for job processes and raw-material information where offered by the interface.

<a id="feature-03"></a>

Integrated Module: Production & Shop-Floor Operations
03

3. Product Master BOM to Job BOM

Verified ERP Capability

Define raw-material and component quantities in the Product Master. When the job is created, the configured material requirements are brought into the job and scaled to its manufacturing quantity. The job may then be edited for an actual project.

  • βœ“All configured BOM items initially populate the job, including items described as optional in the source product setup.
  • βœ“Add/remove/change job-specific material quantities without changing the Product Master BOM.
  • βœ“Display required quantities, used quantities, outstanding requirements and availability positions.
  • βœ“Configure material selection and units within the job's Add Material interface.
  • βœ“Prepare multi-component assembly jobs without recreating the complete material list from scratch.

Important: Optional BOM products are not automatically omitted at job creation; users can adjust the job afterwards.

<a id="feature-04"></a>

Integrated Module: Production & Shop-Floor Operations
04

4. Parent Jobs, Subjobs and Assembly Cost Transfer

Verified ERP Capability

Create subjobs for assemblies manufactured before the main finished product. A subjob has its own production operations and completed-product manufacturing cost.

  • βœ“Build assemblies in separate subjobs.
  • βœ“Finish a subjob, then include that finished assembly as a material in the parent job.
  • βœ“Use the completed subjob's calculated manufacturing cost as the component's material price in the parent job.
  • βœ“Review parent/child manufacturing relationships and print job hierarchy as described in the Production demonstration narrative.

Important: This is sequential cost transfer on consumption of the finished assembly, not a claim that unfinished subjob costs or progress automatically roll up to the parent.

<a id="feature-05"></a>

Integrated Module: Production & Shop-Floor Operations
05

5. Job-Specific Manufacturing Processes

Verified ERP Capability

Configure the actual manufacturing route for a job, with stages such as cutting, assembly, machining, painting, packing or drying. A process can have a name, parent process, planned time, status, instructions, materials, documents, assignee, department and execution resource.

  • βœ“Bring Product Master processes into the job and edit them for the job without overwriting the master setup.
  • βœ“Add, change or remove specific processes as requirements evolve.
  • βœ“Include waiting processes (for example a drying period of 20 hours) in planned durations.
  • βœ“Record Ready To Start, Pending, In-Process, On Hold or Completed statuses as applicable to the process workflows.
  • βœ“Attach raw materials, drawings and instructions to an individual process.

<a id="feature-06"></a>

Integrated Module: Production & Shop-Floor Operations
06

6. One-Time, Per-Item and Hourly Costing

Verified ERP Capability

Manufacturing process setup supports a One Time rate versus a Per Item rate. For example, a one-time setup charge is applied once, whereas a per-item amount is multiplied by the batch quantity. Estimated hours and rate information contribute to process cost calculations.

  • βœ“Configure costing method in process setup.
  • βœ“Record labour or machine cost-per-hour information where applicable.
  • βœ“Include additional rework and scrap-cost fields when recording those operations.
  • βœ“Compare estimated and actual manufacturing costs as the job progresses.

Important: Do not infer a particular accounting allocation methodology for shared overheads or exact blended costing formulas from the existence of these fields.

<a id="feature-07"></a>

Integrated Module: Production & Shop-Floor Operations
07

7. Process Progress, Status and Time Remaining

Verified ERP Capability

The Job Dashboard shows process stage, estimated duration, spent hours and job-level overall progress. Managers can use process completion and remaining estimated work to assess likely time remaining.

  • βœ“Include time-consuming but not continuously worked steps such as drying.
  • βœ“Monitor what process is in progress and what comes next.
  • βœ“Compare estimated versus spent hours for operational reviews.
  • βœ“See priority and status from the job and departmental views.

Important: The precise weighting used for the displayed progress percentage is not separately documented; do not advertise a particular formula.

<a id="feature-08"></a>

Integrated Module: Production & Shop-Floor Operations
08

8. Job Materials β€” Readiness, Order/Excess and Buy

Verified ERP Capability

The Materials grid is designed to show what a production job requires and whether material is available in time for its planned processes. Columns include Total Quantity, Used Quantity, Required Quantity, Order/Excess and Buy.

  • βœ“Click an ongoing or upcoming process to review its associated components.
  • βœ“Cross-check process requirements against job-wide stock and remaining-buy information.
  • βœ“Identify material shortages requiring purchasing action.
  • βœ“Initiate procurement for selected products and quantities directly from job materials.

Important: `Buy` is a job-wide procurement need indicator, not a guarantee of a process-specific purchase schedule. No automatic purchase-date ordering should be claimed.

<a id="feature-09"></a>

Integrated Module: Production & Shop-Floor Operations
09

9. Pick Materials and Issue for Production

Verified ERP Capability

The Pick Material screen lists job raw materials with required, used, need, stock, reserve and Order/Excess figures. Users select products and quantities, then choose Issue For Production to create an SRM material-issue voucher.

  • βœ“Issue only the needed amount, including in stages.
  • βœ“Review job/material quantities before the issue.
  • βœ“Export available pick-list details to Excel where the source UI provides the action.
  • βœ“Update the job's used-material information through the issue workflow.

Important: Do not equate internal SRM material-issue records with external DNO/DNI delivery notes.

<a id="feature-10"></a>

Integrated Module: Production & Shop-Floor Operations
10

10. Job SRM and SRMI Views

Verified ERP Capability

SRM is the job's voucher-level display of production material issues. It includes issue voucher number, date, notes, amount and filters. SRMI is the complementary product-level summary, including product, quantity, average price and amount.

These two views separate voucher tracking from item analysis, reducing clutter on one screen. The main SRM Transactions page manages production issue vouchers outside the individual job view.

Terminology: Some historical screen headings contain subcontract-oriented expansions of the acronyms. Current owner-confirmed behaviour is internal material issue reporting, not a separate subcontract inward transaction.

<a id="feature-11"></a>

Integrated Module: Production & Shop-Floor Operations
11

11. Purchase Requisitions (PR/PRI)

Verified ERP Capability

Review job-linked Purchase Requisitions (PR) and Purchase Requisition Items (PRI), with a search field, creation action, list filters, requesting employee, requested or committed delivery information, quantity and status.

  • βœ“Create requisitions from the job context.
  • βœ“Review requisitions and item-level requirements separately.
  • βœ“Track the requisition number and requested-by information.
  • βœ“Export lists where shown.

<a id="feature-12"></a>

Integrated Module: Production & Shop-Floor Operations
12

12. RFQ Generation and Supplier Quotation Review

Verified ERP Capability

Select job BOM products, quantities and relevant supplier(s) to prepare an RFQ. The RFQ dialog allows payment terms, notes, supporting documents and requested-by attribution.

  • βœ“Attach specifications by uploading documents or linking existing files.
  • βœ“View job-associated RFQs and supplier responses.
  • βœ“Compare supplier details, quoted rates, delivery days, documents and total values.
  • βœ“Use the Generate Purchase Orders action after selecting a suitable supplier quotation.

Supplier links and submitted responses are also part of the previously owner-confirmed Purchase Management workflow.

<a id="feature-13"></a>

Integrated Module: Production & Shop-Floor Operations
13

13. Purchase Order Generation From Job BOM

Verified ERP Capability

The Generate PO workflow takes selected BOM lines and required quantities into a supplier-assignment dialog. Users select the supplier, target warehouse, requested-by employee and relevant supporting documents before generating a PO.

  • βœ“Generate POs for selected material needs rather than manually transcribing the entire BOM.
  • βœ“Keep supplier-specific POs, consistent with the Purchase module's one-supplier-per-PO design.
  • βœ“Review supplier, order date, delivery date, PO status and amounts in job-linked Purchase Orders.
  • βœ“Inspect Purchase Order Items separately with product, quantity, price, tax and line total.

<a id="feature-14"></a>

Integrated Module: Production & Shop-Floor Operations
14

14. Goods Received β€” GRN and GR

Verified ERP Capability

The GRN tab shows job-associated Purchase Invoice/GRN records: PO number, GRN number, supplier, invoice reference, dates and totals. The GR tab shows item-level received goods, including quantity, used quantity, issue quantity, price and PO/GRN references.

  • βœ“Associate several partial GRN/PIs with one job.
  • βœ“Find a supplier invoice from the job.
  • βœ“Issue received product lines for production or rework as appropriate.
  • βœ“Export records where the screen provides that option.

Terminology: In ERPPWA, GRN = Purchase Invoice for this goods-inward workflow. `GR` is the detailed goods-received item view, not an extra invoice stage.

<a id="feature-15"></a>

Integrated Module: Production & Shop-Floor Operations
15

15. Jobs by Department and Priorities

Verified ERP Capability

A department-based visual board presents process cards under columns for production departments and unassigned work. Cards show status, assignee and estimated/spent time information.

  • βœ“View work ready to start, in progress, pending or on hold.
  • βœ“With the relevant permission, reprioritise processes and put work on hold.
  • βœ“Reassign a process to another department or employee where authorised.
  • βœ“Open task messages from a process card.

<a id="feature-16"></a>

Integrated Module: Production & Shop-Floor Operations
16

16. My Jobs β€” Employee Work Timer

Verified ERP Capability

My Jobs shows the production tasks assigned to the logged-in employee. Users can open a task, review the material context and use Start, Pause and Continue to record work duration.

  • βœ“Record actual elapsed work time through the timer.
  • βœ“Allow pauses for breaks or interruptions.
  • βœ“Provide current task assignment and spent/estimated time information.

Important: Employees cannot simply type arbitrary past-hour values to replace the timer record; this is an actual time-tracking workflow, not unrestricted timesheet entry.

<a id="feature-17"></a>

Integrated Module: Production & Shop-Floor Operations
17

17. Machines and Component Serial Selection

Verified ERP Capability

Maintain machine master information including name, model, availability, operating hours and maintenance. Associate a machine with a manufacturing process and specify machine hourly cost for job costing.

  • βœ“Select the machine used when starting a process.
  • βœ“Select the serial number of a component being machined.
  • βœ“Include recorded machine-hour expense in the job's manufacturing cost.

Important: Full serial-number genealogy through every assembly and eventual customer sale is not verified by the latest Production answers.

<a id="feature-18"></a>

Integrated Module: Production & Shop-Floor Operations
18

18. Outsourced Work β€” DNO, DNI and Service Cost

Verified ERP Capability

External machining can be represented as a named production process with expected duration. Job Dashboard tabs display relevant Delivery Notes (DN/DNO) and Delivery Notes In (DNI), including process, supplier and outward/inward quantities.

  • βœ“Use DNO for materials sent to a service supplier; DNI for machined materials received back.
  • βœ“Review linked records from the job.
  • βœ“Record the supplier's work charge through Service Purchase Invoice, Purchase Invoice or a Job Expense entry.
  • βœ“Include those recorded service charges in actual manufacturing cost.

Important: A fully automated Outsource-tag orchestration workflow is not confirmed, despite a legacy process field visible in the screenshot. Do not advertise automatic subcontract dispatch from changing a process tag.

<a id="feature-19"></a>

Integrated Module: Production & Shop-Floor Operations
19

19. Job Scrap, Rework and Rejected Quantities

Verified ERP Capability

Record scrap, rejected products and rework quantities separately. The Scrap view lists products, quantities, dates, recorded value and actions for adding or exporting scrap records.

  • βœ“Identify goods requiring new manufacturing because an earlier component is unusable.
  • βœ“Add a `- Rework` process for remedial operations and capture extra process time/cost.
  • βœ“Use GR's `Issue For Re-Work` action where appropriate.
  • βœ“Record scrap-sale income against the specific job.
  • βœ“Include additional materials and process costs in actual manufacturing cost.

<a id="feature-20"></a>

Integrated Module: Production & Shop-Floor Operations
20

20. Quality Checklists and Completion Controls

Verified ERP Capability

Configure checklist items for a production job, including inspection and testing steps. With permission, employees can mark checklist items complete or pending and add relevant remarks, photographs and documents.

  • βœ“Use checklist status to coordinate verification.
  • βœ“Optionally block job completion until checklist items are completed.
  • βœ“Turn the QC completion requirement off for workflows where that restriction is not desired.

Important: QC is not automatically mandatory for every job; completion enforcement is configurable.

<a id="feature-21"></a>

Integrated Module: Production & Shop-Floor Operations
21

21. Job Documents and Process Instructions

Verified ERP Capability

Attach technical drawings, specifications, photographs and other files to a job or individual process. Upload new files or select documents already stored in the ERP repository.

  • βœ“Search, preview, attach, rename or remove documents using the provided controls.
  • βœ“Store process-specific work instructions beside the operation.
  • βœ“Give workers contextual reference material for the current manufacturing stage.

Important: There is no confirmed automatic document-version history. An updated file is uploaded separately and the previous file can be renamed/tagged manually.

<a id="feature-22"></a>

Integrated Module: Production & Shop-Floor Operations
22

22. Process Task Messages and Notifications

Verified ERP Capability

Workers and managers can exchange messages against production processes. Task messages record author and date/time and are available from the process card.

  • βœ“Notify the relevant user when a new message is posted.
  • βœ“Read the full message inside the job.
  • βœ“Keep communication linked to the actual process rather than an unrelated chat thread.

Important: The channel of the notification is not established as email or WhatsApp.

<a id="feature-23"></a>

Integrated Module: Production & Shop-Floor Operations
23

23. Job Income, Expenses and Finance Integration

Verified ERP Capability

The Job Incomes and Job Expenses views provide date-filterable records of job-specific transactions including description/classification, party, amount, tax and total. Users can add and edit entries.

  • βœ“Record site travel, outside inspection, other production expenses or scrap-sale income against the selected job.
  • βœ“Include job expenses in actual manufacturing cost.
  • βœ“Show income separately from cost summaries.
  • βœ“Automatically create corresponding Finance income/expense ledger entries.

Important: The Job Dashboard is an estimated-versus-actual manufacturing-cost screen, not a per-job sales profit calculation. Profit is available in sales reporting after the product has been sold.

<a id="feature-24"></a>

Integrated Module: Production & Shop-Floor Operations
24

24. Partial Finished Goods and Cost Transfer

Verified ERP Capability

The job editor provides navigation to Finished Goods. Partial Finished Goods vouchers can be generated for completed quantities even while the job remains in progress.

  • βœ“Calculate manufacturing cost using actual raw materials, labour, machine use, outsourced charges and other job expenses.
  • βœ“Update product pricing on the Product Page each time a partial Finished Goods voucher is generated.
  • βœ“Receive completed items into Inventory under the Finished Goods workflow.
  • βœ“Keep job status under authorised manual control rather than automatically marking the job permanently closed.

Important: Per-batch exact cost-allocation method and retroactive repricing of previously completed batches were not specified.

<a id="feature-25"></a>

Integrated Module: Production & Shop-Floor Operations
25

25. Connected Sales, Purchase, Inventory and Finance Views

Verified ERP Capability

ERPPWA links Production with neighbouring modules:

  • βœ“Sales: Production jobs may be planned for product demand represented by several Sales Orders, but are created separately.
  • βœ“Purchase: Create RFQs and POs, review PR, RFQ, PO and Goods Received in job context.
  • βœ“Inventory: Issue materials through Pick/SRM, track stock requirements, handle DNO/DNI movements and record Finished Goods.
  • βœ“Finance: Post additional income/expenses to ledgers and include eligible service charges in manufacturing cost.
  • βœ“After sale: View profitability through Sales reports using the product's actual cost, rather than calling estimated manufacturing cost 'profit'.

---

## Which production activity uses which ERPPWA screen?

ActivityScreen / voucherWhat the user does
Start manufacturing a batchJob / Edit JobCreate the job separately, set quantity and manufacturing details
Check upcoming process materialsJob Dashboard β†’ Process + MaterialsReview upcoming process, job-wide Buy quantities and shortages
Source raw materialsJob Materials β†’ Generate RFQ / POSelect products, quantities and suppliers for purchasing
Issue raw material to productionJob Dashboard β†’ Pick / SRMGenerate the issue voucher for selected quantities
Review material issue linesJob Dashboard β†’ SRMISee issued products, quantities, average prices and values
Review purchased goodsJob Dashboard β†’ GRN / GRView job-linked Purchase Invoice vouchers and received item lines
Track employee work timeMy JobsStart, pause and continue the assigned-process timer
Record outside machining movementsJob Dashboard β†’ DNO / DNIReview outward and returning material documents
Check quality or reworkChecklist / GR / ProcessTrack QC status, rework issue and added rework work
Record finished outputFinished Goods voucherBring completed quantities into stock and update product pricing

## Frequently Asked Questions

Does ERPPWA support make-to-order manufacturing? Yes. Jobs can be configured for customised products with job-specific BOMs and manufacturing processes.

Can a manufacturing job be generated automatically from a Sales Order? No. A user creates the job separately. This allows additional production details to be entered.

Can one production job cover multiple Sales Orders? For the same standard product, production can be planned as one batch for combined demand, such as three orders of 100, 200 and 300 units. Exact document linking depends on the relevant Job entry workflow.

Does ERPPWA support subjobs for assemblies? Yes. Completed assembly subjobs can supply their finished products, at their completed manufacturing cost, to a parent job.

Can a manager generate RFQs and Purchase Orders from BOM requirements? Yes. The job Materials section supports product and quantity selection for RFQ and PO generation.

Does ERPPWA automatically schedule purchasing dates for future production processes? No automatic date-based purchasing workflow is confirmed. Managers review ongoing/upcoming process needs and the job Materials shortage/Buy information.

How does My Jobs record employee hours? Employees use a start/pause/continue timer; arbitrary manual entry of worked hours is not part of the confirmed workflow.

Can a quality check block job completion? Yes, when the configurable completion restriction is enabled. It may also be switched off.

Can scrap, rework and rejected materials be tracked separately? Yes. Rework can add a separate process, with extra time/material expenses included in job cost.

Does ERPPWA display profit for unfinished production jobs? No. The Job Dashboard compares estimated and actual production costs. Profit is assessed after sale in the Sales reporting workflow.

Can a job generate finished goods in several batches? Yes. Partial Finished Goods vouchers are supported and update relevant product pricing each time.

---

## Start using ERPPWA Production Management

Explore how your manufacturing teams can manage jobs, components, shop-floor processes, quality, supplier work, job expenses and finished goods through a connected cloud ERP.

Primary CTA: Start Your Free 20-Day Trial Secondary CTA: Explore Production Management Problems & Solutions

Integrated Module: Production & Shop-Floor Operations
⚑ 6-Step Plan-to-Produce Manufacturing Workflow

The Complete Shop-Floor Production Lifecycle

Eliminate shop-floor delays and unaccounted scrap. ERPPWA links customer sales orders, multi-level BOM explosion, shortage auto-POs, material issues, outside job work, and finished goods inward into one synchronized pipeline.

1

Sales Order to Job & BOM

Convert confirmed customer POs into Production Jobs. Explode multi-level Bills of Materials (BOM), sub-assembly requirements, and process routing templates.

2

Shortage Calculation & Auto-PO

Compare BOM raw material needs against current free warehouse balances. Auto-generate Job-Wise Purchase Orders with scheduled deliveries for long-term jobs.

3

Material Issue & Serial Tagging

Issue raw materials to production in 1 click, moving them into Work-in-Progress (WIP). Record raw material heat codes and serial numbers inside master products.

4

Department Routing & Job Cards

Issue printable and digital Job Cards to lathe, milling, fabrication, and assembly floors. Track operator hours, machine runtimes, and completed quantities live.

5

Subcontractor Job Work & QC

Dispatch items for heat treatment or coating with contractor Delivery Notes. Inspect returned goods via standardized QC Templates and log rework/scrap.

6

Finished Goods Inward & Costing

Transfer inspected goods into warehouse inventory. Calculate actual unit cost: Used Materials + Process Expenses + Direct Labor for true gross profit visibility.

⚑ Operational Capabilities

End-to-End Manufacturing & Shop-Floor Features

Explore how ERPPWA eliminates production delays, automates material staging, and enforces actual batch costing.

πŸ“‘ Multi-Level BOM βš™οΈ Process Routing Templates πŸ–¨οΈ Print Job BOM

Multi-Level Bill of Materials (BOM) & Process Templates

⚠️ The Operational Challenge

Complex manufactured assemblies consist of dozens of sub-assemblies, raw metals, hardware fasteners, and outside heat treatments. Managing BOMs on spreadsheets leads to missing components, unexpected shop-floor stoppages, and inaccurate pre-order cost estimations.

✨ The ERPPWA Solution

Formulate nested, multi-level Bills of Materials (BOM) with complete operational process routing. Define raw materials, sub-assemblies, scrap percentages, and process sequences (Cutting → Machining → Heat Treatment → Assembly). Print comprehensive Job BOMs with drawings and routing notes in 1 click.

  • βœ“Multi-level nested BOM hierarchy for complex assemblies & parts
  • βœ“Process routing templates mapping sequences, runtimes & machines
  • βœ“Print Job BOM with processes and cutting specifications for workers
  • βœ“Component scrap percentage allowances and recovery factor calculations
  • βœ“Pre-production standard cost estimation vs. actual cost comparisons
  • βœ“1-Click duplicate & clone BOM tool to quickly spin off product variants

Standardize manufacturing blueprints and ensure 100% component availability before production starts.

Schedule Guided Demo →
Bill of Materials & Routing • Live UI
πŸ“‘ BOM Explosion: Hydraulic Cylinder 80mm
● BOM VERIFIED (REV 3)
14 Parts
Components in BOM
5 Stages
Process Routing
β‚Ή 3,420
Est. Unit Cost
Component / Part Qty Required Scrap % Stage / Process
SS316 Seamless Tube 1.25 Meters 2.5% CNC Turning • M-01
Piston Rod (En8D Hardened) 1.00 Pcs 0.0% Hard Chrome • Outside
Hydraulic Seal Kit (Viton) 1.00 Set 0.0% Final Assembly Line
πŸ–¨οΈ Shop-Floor Handover 1-Click Print Job BOM with complete technical drawings attached
πŸ“‹ Digital Job Cards πŸ“ Department-Wise Progress πŸ‘· Employee Work Logs

Production Jobs, Job Cards & Department Tracking

⚠️ The Operational Challenge

When a customer calls asking about their order status, factory supervisors run across machining, grinding, and fabrication shops with clipboards asking: "Where is this job right now?" Paper job cards get soiled, lost, or back-dated by operators.

✨ The ERPPWA Solution

Gain live real-time visibility across all shop-floor stages with Job Tracking by Department. ERPPWA issues digital Job Cards per employee and process. Operators scan job cards, log machine runtime hours, and record completed parts, updating management dashboards instantaneously.

  • βœ“Individual digital and printable Job Cards per employee and process
  • βœ“Live Job Tracking by Department (Cutting, Turning, Welding, Assembly)
  • βœ“Real-time percentage progress tracking on every active work order
  • βœ“Logged operator labor hours linked directly to job cost ledgers
  • βœ“'My Jobs' mobile view for floor supervisors and line managers
  • βœ“Eliminates shop-floor confusion and stops operators picking wrong jobs

Answer customer dispatch inquiries in 5 seconds without leaving your desk.

Schedule Guided Demo →
Department Job Tracker • Live UI
πŸ“ Job Tracking by Department
● 18 ACTIVE JOBS
Job No / Product Current Department Assigned Operator Stage Progress
JOB-2026-088
Hydraulic Cylinder 80mm
CNC Machining • Bay 2 Rajesh K. (Lathe 04) 75% • IN-PROGRESS
JOB-2026-092
SS316 Flanges (250 Pcs)
Outside Contractor Apex Hard Chrome DELIVERY NOTE #42
JOB-2026-094
Shaft Coupling Sets
Quality Control (PDI) Vikas M. (QC Lead) 95% • FINAL INSPECT
92.4%
On-Time Stage Execution
0 Paper Loss
Digital Barcode Job Cards
πŸ“Š Required to Purchase List ⚑ Job-Wise Purchase Orders πŸ“… Scheduled Long-Term Buying

Smart Job-Wise Material Planning & Shortage Auto-PO

⚠️ The Operational Challenge

Production begins on a high-value order, only for the assembly line to grind to an emergency halt on Day 4 because a specific bronze bushing or O-ring was out of stock. Purchasing buys at 30% premium market rates, eroding job margins.

✨ The ERPPWA Solution

Never suffer material shortages during production. When a job is released, ERPPWA calculates the 'Required to Purchase Stock List' comparing BOM needs against unreserved warehouse stock. Generate Job-Wise Purchase Orders in 1 click and schedule phased deliveries for long-term production contracts.

  • βœ“Automated 'Required to Purchase Stock List' calculation per job
  • βœ“Job-wise Purchase Orders (PO) linked directly to the parent work order
  • βœ“Job-wise Goods Received Notes (GRN) automatically tagging received items
  • βœ“Scheduled phased raw material purchasing for multi-month projects
  • βœ“Prevents over-purchasing and frees up working capital from dead stock
  • βœ“Full audit visibility: see which PO supplied materials to which finished job

Ensure 100% material staging before releasing jobs to the shop floor.

Schedule Guided Demo →
Material Shortage & Auto-PO • Live UI
πŸ“Š Required to Purchase: JOB-2026-088
● 2 ITEMS SHORT
Raw Material / Part Job Need Free Stock Shortage & Action
SS316 Seamless Tube 120 Meters 150 Meters βœ“ IN-STOCK (RESERVED)
En8D Piston Rod 40mm 80 Meters 20 Meters ⚑ 1-Click PO: 60 Mtr
Viton Hydraulic Seals 100 Sets 40 Sets ⚑ 1-Click PO: 60 Sets
πŸ“… Phased Purchasing Scheduled Delivery: Batch 1 on 10-Oct • Batch 2 on 24-Oct
πŸ“¦ Material Issued to Production πŸ”’ Raw Material Serial Tagging πŸ›‘οΈ Cradle-to-Grave Trace

Material Issued to Production & Serial Traceability

⚠️ The Operational Challenge

When raw materials leave warehouse shelves, storekeepers deduct inventory on paper slips without recording which serial numbers or heat batches went into which finished machines. During ISO or customer quality audits, proving component origins takes weeks of manual digging.

✨ The ERPPWA Solution

Enforce 100% material accountability with digital Material Issue slips. ERPPWA deducts store stock and transfers inventory directly into shop-floor Work-in-Progress (WIP). Record raw material serial numbers and supplier heat codes embedded inside each master product for instant backward trace.

  • βœ“1-Click Material Issue against authorized jobs and BOM quantities
  • βœ“Real-time Work-in-Progress (WIP) valuation and shop-floor balance tracking
  • βœ“Embedded component serial number recording inside master product records
  • βœ“Material return voucher for returning excess unused raw stock back to store
  • βœ“Prevents unauthorized consumption or unmonitored material diversions
  • βœ“Cradle-to-grave audit certificate ready for Tier-1 defense and OEM audits

Pass rigorous customer quality audits with push-button component genealogy.

Schedule Guided Demo →
Material Issue & Genealogy • Live UI
πŸ“¦ Material Issue Slip: MIP-2026-042
● ISSUED TO JOB #088
Material Issued Heat / Batch No Quantity Master Product Serial
SS316 Forged Cylinder Body HEAT-8812-JINDAL 25 Pcs SN-HYD-2026-001 to 025
Hardened Piston Rods BATCH-CHROME-412 25 Pcs TAGGED TO ASSEMBLY
High-Pressure Seals LOT-VT-9902 25 Sets βœ“ QC VERIFIED
πŸ” Component Traceability When SN-HYD-001 is queried → Heat code JINDAL-8812 identified in 1s
🚚 Subcontractor Job Work πŸ“‘ Contractor Delivery Notes βš–οΈ Scrap & Shrinkage Audit

Subcontractor & Contractor Job Work Management

⚠️ The Operational Challenge

Sending semi-finished goods for outside electroplating, galvanizing, or precision grinding creates huge inventory blindspots. Dispatched quantities don't match returned items, scrap is undocumented, and contractor labor bills are paid without physical verification.

✨ The ERPPWA Solution

Master outside job work with process-wise Delivery Notes. Generate official subcontracting gate-passes specifying operations (e.g. Chrome Plating). Track goods sent, goods received back, process shrinkage percentages, and approve contractor labor billing automatically against received quantities.

  • βœ“Process-wise Delivery Notes for goods sent to external job workers
  • βœ“Job-wise goods received note (GRN) from contractors with QC checks
  • βœ“Allowable process shrinkage & contractor scrap reconciliation
  • βœ“Contractor labor voucher generation linked directly to PO rate contracts
  • βœ“Pending contractor stock report showing parts sitting at external vendors
  • βœ“Statutory GST Job Work delivery challan (ITC-04) compliance ready

Eliminate vendor inventory leaks and verify contractor invoices with zero disputes.

Schedule Guided Demo →
Subcontractor Job Work • Live UI
🚚 Contractor Delivery Notes & Receipts
● SUBCONTRACTING ACTIVE
Delivery Note / Vendor Outside Process Qty Sent → Recd Scrap / Status
DN-CONT-2026-081
Apex Hard Chrome Ltd
Hard Chrome Plating (50 Micron) 80 Pcs → 80 Pcs βœ“ QC PASSED (100%)
DN-CONT-2026-082
Shree Ganesh Heat Treat
Induction Hardening HRC 58 200 Pcs → 196 Pcs 4 Pcs Scrap (2% Norm)
DN-CONT-2026-083
Pooja Grinding Works
Centerless Cylindrical Grind 150 Pcs → Pending AT CONTRACTOR (DUE 2D)
πŸ“‘ 1-Click Billing Approved 80 Pcs Chrome Plating → 1-Click convert to Contractor Bill
πŸ’° Actual Production Costing πŸ“ˆ True Gross Margin Realization πŸ” Variance Analysis

Actual Production Costing: Materials + Labor + Overhead

⚠️ The Operational Challenge

Manufacturers quote prices based on standard BOM estimates, but real production incurs machine electricity spikes, operator overtime, tool wear, and scrap rejections. Factory owners only discover months later that high-volume jobs actually lost money.

✨ The ERPPWA Solution

Calculate true landed production costs with mathematical precision. ERPPWA applies the exact formula: Used Materials + Process Expenses + Direct Labor = Actual Production Cost. Gain live variance reports comparing standard estimates to actual batch cost, protecting net profitability.

  • βœ“Formula: Used Materials + Process Expenses + Labor = Actual Cost
  • βœ“Live variance tracking between estimated BOM cost and real batch cost
  • βœ“Direct operator labor cost absorption based on logged Job Card hours
  • βœ“Machine electricity, tooling & outside contractor expense allocation
  • βœ“Finished goods unit inventory valuation updated at true actual cost
  • βœ“Batch profitability reports identifying high-margin vs loss-making jobs

Price your products with scientific confidence and eliminate hidden factory margin erosion.

Schedule Guided Demo →
Actual Costing Console • Live UI
πŸ’° Actual Production Cost: JOB-2026-088
● BATCH COMPLETED
β‚Ή 1,72,500
Raw Materials Used
β‚Ή 48,200
Labor (64 Hours)
β‚Ή 26,400
Overhead / Subcontract
Cost Element BOM Estimate Actual Incurred Variance & Impact
Raw Materials (Alloy Steel) β‚Ή 1,68,000 β‚Ή 1,72,500 +2.6% (Metal Spike)
Direct Machinist Labor β‚Ή 52,000 β‚Ή 48,200 -7.3% (Ahead of Sched)
Chrome Plating & Power β‚Ή 25,000 β‚Ή 26,400 +5.6% (Freight)
🎯 Real Batch Profitability Actual Unit Cost: β‚Ή 3,294 / pc • Realized Gross Margin: 32.1%
πŸ” Standardized QC Templates πŸ”„ Job-Wise Rework Management πŸ’΅ Scrap Sales Income Tracking

Quality Control (QC), Rework & Scrap Accounting

⚠️ The Operational Challenge

Quality checks performed verbally without standardized inspection templates result in defective goods slipping through to clients. Reworked parts incur unrecorded operator labor, and scrap metals are sold for cash without accounting entries or recovery tracking.

✨ The ERPPWA Solution

Institutionalize zero-defect manufacturing discipline. ERPPWA provides standardized QC Templates for inward receiving, in-process stages, and final pre-dispatch inspection (PDI). Track job-wise rework cycles with separate labor tracking, and record scrap generation alongside scrap sales income.

  • βœ“Configurable QC Templates with dimensional tolerances & testing criteria
  • βœ“Inspection stages: Inward raw material, In-process stage, and Final PDI
  • βœ“Dedicated Rework Jobs with labor logging and root-cause analysis
  • βœ“Record scrap generation weight by job and allocate scrap recovery incomes
  • βœ“Prevents dispatch of uninspected goods or pending QC clearance items
  • βœ“Print official Quality Inspection Certificates (EN 10204 3.1) in 1 click

Protect your brand reputation and recover hidden profits from systematic scrap control.

Schedule Guided Demo →
Quality & Scrap Console • Live UI
πŸ” QC Inspection: Hyd Cylinder 80mm
● INSPECTION PASSED
Inspection Parameter Spec Tolerance Observed Value QC Result
Bore Diameter (ID) 80.00 ± 0.02 mm 80.012 mm βœ“ WITHIN TOLERANCE
Chrome Layer Thickness Min 35 μm 42 μm βœ“ PASSED
Hydrostatic Pressure Test 250 Bar (15 Mins) 252 Bar • 0 Leak CERTIFIED 3.1
πŸ’΅ Scrap Recovery Ledger 14 KGs Turnings Scrapped • β‚Ή 560 Scrap Income Credited to Job #088
🚨 Predictive Delay Intelligence ⏱️ Job Intime / Delay Reports πŸ› οΈ Machine Management

Machine Management & Predictive Delay Intelligence

⚠️ The Operational Challenge

Machine breakdowns, tooling bottlenecks, and unmonitored stage delays cause promised customer delivery dates to breach. Factory owners and sales reps only find out a shipment is late on the promised dispatch day itself, damaging buyer trust and triggering penalties.

✨ The ERPPWA Solution

Eliminate surprise delays with predictive shop-floor intelligence. ERPPWA includes Machine Management and three proactive tracking reports: Job Intime Report, Job Possible Delay Report, and Job Delay Report. Identify bottlenecks 3 to 5 days in advance and reallocate machine loads proactively.

  • βœ“Predictive Job Possible Delay Report alerting on emerging bottlenecks
  • βœ“Job Intime Report celebrating on-schedule completion and operator speed
  • βœ“Root-cause delay analysis: Material shortage, Machine downtime, Subcontractor
  • βœ“Machine Management: runtime logging, planned maintenance, and utilization
  • βœ“1-Click Finished Goods Inward transferring completed jobs to store inventory
  • βœ“Executive production dashboard with overall plant OEE and dispatch timelines

Achieve 98%+ on-time delivery rates and delight high-value enterprise buyers.

Schedule Guided Demo →
Machine & Delay Monitor • Live UI
🚨 Predictive Delay Intelligence
● DISPATCH GUARANTEE
Job No / Customer Promised Date Current Stage Predictive Risk Status
JOB-2026-088
Bharat Heavy Machineries
12-Oct-2026 Assembly Line 01 βœ“ INTIME (1.5d Ahead)
JOB-2026-092
Shreeji Auto Components
14-Oct-2026 Outside Chrome Plating ⚠️ POSSIBLE DELAY (12h Risk)
JOB-2026-095
Apex Tooling Solutions
08-Oct-2026 Finished Goods Store βœ“ COMPLETED • INWARDED
⚑ Proactive Action Trigger JOB-092 flagged: Expedite contractor follow-up to preserve 14-Oct dispatch
🎯 41 Field-Tested Solutions (PROD-01 to PROD-41)

Manufacturing Production Problems & Field-Tested Solutions

A material shortage affects purchasing; a delayed process affects delivery; rejected parts distort profit. Filter by operational area to explore how ERPPWA solves each manufacturing bottleneck:

PROD-01
Job Planning & Engineering

Production orders lack manufacturing details

Operational Challenge

A customer order does not necessarily contain the warehouse, detailed processes, material changes and production instructions needed on the factory floor.

ERPPWA Connected Solution

Create a separate Production Job with product, quantity, customer context, due date, warehouse, status and editable production details.

Key Business Gains:
  • βœ“Capture manufacturing-specific fields.
  • βœ“Keep a distinct job record.
  • βœ“Review due dates.
  • βœ“Track product and quantity.
  • βœ“Work from one Job Dashboard.
PROD-02
Job Planning & Engineering

Several standard-product orders create duplicate production planning

Operational Challenge

Multiple orders for the same fixed product can lead to needless planning of small manufacturing batches.

ERPPWA Connected Solution

Plan one production job for a combined standard-product batch, such as 100 + 200 + 300 units, while keeping job creation separate from Sales Orders.

Key Business Gains:
  • βœ“Consolidate production demand.
  • βœ“Plan a consistent product batch.
  • βœ“Review a total production quantity.
  • βœ“Keep job-specific setup.
  • βœ“Avoid assuming automatic job creation.
PROD-03
Job Planning & Engineering

Custom jobs need a different BOM from the standard product

Operational Challenge

A custom machine may use different components from the Product Master BOM, but a one-time job should not permanently change the standard build.

ERPPWA Connected Solution

Bring configured BOM items into the job, then edit the job-specific component list without modifying the Product Master definition.

Key Business Gains:
  • βœ“Start from an existing BOM.
  • βœ“Adjust quantities.
  • βœ“Add special components.
  • βœ“Remove unsuitable lines.
  • βœ“Protect standard master data.
PROD-04
Job Planning & Engineering

Manufacturing routes change for individual customer jobs

Operational Challenge

A standard process route may not match an engineered order or a one-off project.

ERPPWA Connected Solution

Copy the configured manufacturing processes into a job and edit operation details, assignees, hours, instructions and materials within that job only.

Key Business Gains:
  • βœ“Reuse process templates.
  • βœ“Adapt operations.
  • βœ“Assign resources.
  • βœ“Revise job instructions.
  • βœ“Preserve Product Master processes.
PROD-05
Job Planning & Engineering

Complex machines need separately built subassemblies

Operational Challenge

Assemblies built for a machine may require their own jobs and costs before final assembly.

ERPPWA Connected Solution

Create assembly subjobs, complete them and use their finished productsβ€”at their manufacturing costβ€”as materials in the parent job.

Key Business Gains:
  • βœ“Separate assembly work.
  • βœ“Capture assembly cost.
  • βœ“Plan parent requirements.
  • βœ“Reuse completed subassemblies.
  • βœ“Improve component cost traceability.
PROD-06
Job Planning & Engineering

Setup and batch costs are easily calculated incorrectly

Operational Challenge

A one-time setup charge should not multiply with output, while a per-unit processing charge should.

ERPPWA Connected Solution

Configure each operation as One Time or Per Item, with relevant process quantities, hours and cost settings.

Key Business Gains:
  • βœ“Separate setup charges.
  • βœ“Calculate per-unit charges.
  • βœ“Record planned hours.
  • βœ“Compare costing methods.
  • βœ“Support different types of operation.
PROD-07
Job Planning & Engineering

Waiting processes are missing from completion estimates

Operational Challenge

Drying, curing or similar waiting time affects when a product will be ready even if a worker is not actively machining it.

ERPPWA Connected Solution

Add a dedicated process with its expected duration, such as a 20-hour drying step, to the job route.

Key Business Gains:
  • βœ“Represent required waiting.
  • βœ“Preserve process order.
  • βœ“Improve time estimates.
  • βœ“Show upcoming steps.
  • βœ“Explain scheduling assumptions.
PROD-08
Material Planning & Procurement

Production staff cannot see which materials the next process needs

Operational Challenge

A job may have hundreds of components, and managers need to inspect upcoming steps without searching a full BOM manually.

ERPPWA Connected Solution

Open ongoing or upcoming processes and review their associated materials alongside the job-wide Materials grid.

Key Business Gains:
  • βœ“See next-process requirements.
  • βœ“Find linked parts.
  • βœ“Compare against job totals.
  • βœ“Check availability.
  • βœ“Plan procurement decisions.
PROD-09
Material Planning & Procurement

Material shortages are identified too late

Operational Challenge

Teams can know how much a job needs but not how much remains to buy.

ERPPWA Connected Solution

Use Total Qty, Used Qty, Required Qty, Order/Excess and Buy to review shortages at the job level.

Key Business Gains:
  • βœ“See remaining material needs.
  • βœ“Compare used with required.
  • βœ“Review availability position.
  • βœ“Identify buy quantities.
  • βœ“Reduce manual reconciliation.
PROD-10
Material Planning & Procurement

Job-specific purchase requests disappear into email

Operational Challenge

Stores and Production may request materials without a clear requisition reference or status.

ERPPWA Connected Solution

Create and review job-linked Purchase Requisitions and PR line items with requester, quantities, dates and statuses.

Key Business Gains:
  • βœ“Reference each request.
  • βœ“See requested quantities.
  • βœ“Review status.
  • βœ“Track employee attribution.
  • βœ“Export available records.
PROD-11
Material Planning & Procurement

RFQ preparation requires copying a BOM into supplier enquiries

Operational Challenge

Purchasing teams lose time transferring component lists, quantities, specifications and supplier selections manually.

ERPPWA Connected Solution

Select job BOM products and quantities, choose supplier(s), payment terms, notes and documents, then generate RFQs.

Key Business Gains:
  • βœ“Reuse selected BOM lines.
  • βœ“Carry quantities.
  • βœ“Attach specifications.
  • βœ“Record requested-by.
  • βœ“Prepare supplier enquiries.
PROD-12
Material Planning & Procurement

Supplier quotations are difficult to compare for a job

Operational Challenge

Price and delivery terms for one component may come from several suppliers.

ERPPWA Connected Solution

Open linked RFQ Responses and compare supplier rates, total amounts, delivery days, notes and documents before selecting a deal.

Key Business Gains:
  • βœ“See quotes together.
  • βœ“Compare prices.
  • βœ“Review delivery expectations.
  • βœ“Check attachments.
  • βœ“Move selected details into PO workflow.
PROD-13
Material Planning & Procurement

Purchase Orders require repeated entry of job materials

Operational Challenge

A job has an accurate requirement list, yet purchasing staff may manually recreate it on supplier orders.

ERPPWA Connected Solution

Select the required BOM items and initiate supplier-specific Purchase Orders with supplier, warehouse, employee and document details.

Key Business Gains:
  • βœ“Reuse selected products.
  • βœ“Reuse requested quantities.
  • βœ“Assign a supplier.
  • βœ“Select destination warehouse.
  • βœ“Keep the PO job-linked.
PROD-14
Material Planning & Procurement

A manager cannot see which job Purchase Orders remain pending

Operational Challenge

Production plans can be affected by missing supplier deliveries, but procurement status may be stored in a separate department.

ERPPWA Connected Solution

Review the job-linked PO list and the item-level POI view with supplier, order dates, quantities, tax and status.

Key Business Gains:
  • βœ“Check order references.
  • βœ“Inspect supplier commitments.
  • βœ“See PO details.
  • βœ“Review ordered items.
  • βœ“Coordinate purchasing follow-up.
PROD-15
Material Planning & Procurement

Incoming purchases are not clearly tied to a production job

Operational Challenge

When multiple invoices arrive from different suppliers, users need to know which materials have been received for which job.

ERPPWA Connected Solution

Review multiple job-linked GRN/Purchase Invoice records and the GR item-line view with received and used quantities.

Key Business Gains:
  • βœ“See supplier invoices.
  • βœ“Review receipt dates.
  • βœ“Trace product quantities.
  • βœ“Identify issued volumes.
  • βœ“Use received lines for production or rework.
PROD-16
Execution & Workforce

Production information is scattered across multiple departments

Operational Challenge

Separate spreadsheets for jobs, material issues, invoices and processes make it difficult to understand one manufacturing batch.

ERPPWA Connected Solution

Use the Job Dashboard to open processes, materials, estimated/actual cost, PR, RFQ, PO, GRN, issue records, expenses and scrap in context.

Key Business Gains:
  • βœ“Keep job context.
  • βœ“Navigate linked transactions.
  • βœ“View process progress.
  • βœ“Review costs.
  • βœ“Locate outstanding material work.
PROD-17
Execution & Workforce

Department managers struggle to see work waiting in each area

Operational Challenge

Work for cutting, assembly, painting or testing may be assigned to different departments with unclear priority.

ERPPWA Connected Solution

Use Jobs by Department to view process cards grouped by department, status, assignee and estimated/spent time.

Key Business Gains:
  • βœ“See workload by area.
  • βœ“Identify pending stages.
  • βœ“Review staff assignments.
  • βœ“Compare time metrics.
  • βœ“Open related process records.
PROD-18
Execution & Workforce

Urgent work cannot be reprioritised cleanly

Operational Challenge

Factory priorities change when a critical customer job, material delay or machine problem arises.

ERPPWA Connected Solution

With permission, managers can change a process priority or mark it On Hold.

Key Business Gains:
  • βœ“Signal urgent work.
  • βœ“Identify suspended tasks.
  • βœ“Reduce verbal ambiguity.
  • βœ“Respect manager permissions.
  • βœ“Keep process status visible.
PROD-19
Execution & Workforce

A process needs reassignment after work has started

Operational Challenge

Employees, machines or department availability can change during a job.

ERPPWA Connected Solution

Authorised managers can reassign a process to a different department or employee even after it has started.

Key Business Gains:
  • βœ“Respond to staff changes.
  • βœ“Shift department responsibility.
  • βœ“Keep the job record current.
  • βœ“Control the action with permissions.
  • βœ“Reduce scattered reassignment notes.
PROD-20
Execution & Workforce

Employees see too many jobs that are not theirs

Operational Challenge

A factory employee needs a focused worklist rather than the full factory production queue.

ERPPWA Connected Solution

My Jobs displays tasks assigned to the logged-in employee, with relevant job status and material context.

Key Business Gains:
  • βœ“Focus on assigned work.
  • βœ“Open current tasks.
  • βœ“Review estimated time.
  • βœ“See progress.
  • βœ“Avoid searching every department job.
PROD-21
Execution & Workforce

Actual process hours are recorded inaccurately from memory

Operational Challenge

Staff may estimate hours after completing the work, making job cost and duration less reliable.

ERPPWA Connected Solution

Use a Start, Pause and Continue timer in My Jobs to record elapsed work time instead of unrestricted manual typing.

Key Business Gains:
  • βœ“Track active work.
  • βœ“Pause for breaks.
  • βœ“Continue the same task.
  • βœ“Preserve spent-hour context.
  • βœ“Avoid retrospective guesswork.
PROD-22
Execution & Workforce

Machine use is not connected to production costing

Operational Challenge

Manufacturers need to know which machine performed a process and what its operating time costs.

ERPPWA Connected Solution

Maintain machine details, select the machine when starting work and include the configured machine-hour rate in manufacturing cost.

Key Business Gains:
  • βœ“Associate equipment with work.
  • βœ“Capture machine-hour basis.
  • βœ“Review availability.
  • βœ“Record maintenance context.
  • βœ“Improve process cost visibility.
PROD-23
Execution & Workforce

Part serial numbers are disconnected from the operation being performed

Operational Challenge

A technician machining a numbered component should be able to identify the relevant part in the process record.

ERPPWA Connected Solution

At process start, employees can select the machine and serial number of the part being worked on.

Key Business Gains:
  • βœ“Identify the selected part.
  • βœ“Associate it with work context.
  • βœ“Reduce part ambiguity.
  • βœ“Support serial-based review.
  • βœ“Keep process data more specific.
PROD-24
Material Movement & Outsourcing

Issuing materials from the warehouse lacks a job reference

Operational Challenge

Raw materials can be consumed without clear reference to the production job and its remaining requirements.

ERPPWA Connected Solution

Use Pick to select job material lines and generate SRM material-issue vouchers; issue amounts in stages when required.

Key Business Gains:
  • βœ“Select from job requirements.
  • βœ“View needed quantities.
  • βœ“Review stock and reserves.
  • βœ“Create issue records.
  • βœ“Support partial issues.
PROD-25
Material Movement & Outsourcing

Voucher totals and product-level material use are mixed together

Operational Challenge

A long material-issue history is difficult to read when document and product details appear in one table.

ERPPWA Connected Solution

Use SRM for issue voucher numbers/dates/amounts and SRMI for product quantities, average prices and totals.

Key Business Gains:
  • βœ“Separate voucher context.
  • βœ“See item-level consumption.
  • βœ“Review quantities.
  • βœ“Check values.
  • βœ“Keep each report readable.
PROD-26
Material Movement & Outsourcing

Materials sent outside for machining are hard to account for

Operational Challenge

External suppliers may hold components while the manufacturing job is still active.

ERPPWA Connected Solution

Track outgoing materials through DNO and their return through DNI; view associated records and quantities from the job.

Key Business Gains:
  • βœ“See outward notes.
  • βœ“Review linked processes.
  • βœ“Check returned quantities.
  • βœ“Keep supplier context.
  • βœ“Track outside movement.
PROD-27
Material Movement & Outsourcing

Outside machining charges are missing from actual job cost

Operational Challenge

A supplier’s machining invoice or manual service expense can be omitted from the cost of the manufactured product.

ERPPWA Connected Solution

Record the service charge through SPI, PI or the job Expenses section; the supported entries contribute to manufacturing cost.

Key Business Gains:
  • βœ“Capture supplier service cost.
  • βœ“Use different invoice routes.
  • βœ“Link expenses to job.
  • βœ“Compare with estimates.
  • βœ“Reduce hidden production expenses.
PROD-28
Quality, Rework & Scrap

Different jobs need different quality checklists

Operational Challenge

A standard checklist may not cover the inspection needs of customised machines or individual batches.

ERPPWA Connected Solution

Create job-specific quality checklist items with relevant notes, photos and documents.

Key Business Gains:
  • βœ“Tailor checks to job.
  • βœ“Capture supporting files.
  • βœ“Record remarks.
  • βœ“Give authorised staff access.
  • βœ“Review pending checks.
PROD-29
Quality, Rework & Scrap

A job is marked complete while quality checks are pending

Operational Challenge

Closing a manufacturing job prematurely can hide unfinished inspection work.

ERPPWA Connected Solution

Enable the configurable QC completion restriction to prevent job completion while checklist items remain pending.

Key Business Gains:
  • βœ“See incomplete checks.
  • βœ“Enforce QC when needed.
  • βœ“Configure by business policy.
  • βœ“Control staff permissions.
  • βœ“Avoid unreviewed job closure.
PROD-30
Quality, Rework & Scrap

Rejected components are not distinguished from reworkable parts

Operational Challenge

A failed component may be recoverable through extra processing or may require a replacement item.

ERPPWA Connected Solution

Record Rejected, Rework and Scrap quantities separately and issue additional material when unusable components must be replaced.

Key Business Gains:
  • βœ“Distinguish defect outcomes.
  • βœ“Identify replacement needs.
  • βœ“Keep rejected quantities visible.
  • βœ“Record rework separately.
  • βœ“Support better production reviews.
PROD-31
Quality, Rework & Scrap

Rework time and cost disappear into normal production

Operational Challenge

Unexpected rework makes the job costlier than estimated, but teams may not record its cause and effort.

ERPPWA Connected Solution

Create a new process named after the original with ` - Rework`, record work details and include additional expense in manufacturing cost.

Key Business Gains:
  • βœ“Identify extra operations.
  • βœ“Capture time and labour.
  • βœ“Include material expense.
  • βœ“Compare to estimate.
  • βœ“Keep a rework process record.
PROD-32
Quality, Rework & Scrap

Scrap quantities and value are not available for review

Operational Challenge

Waste can accumulate without a clear job-specific register.

ERPPWA Connected Solution

Use the job Scrap list to record products, quantities, date and value; add and export scrap entries where supported.

Key Business Gains:
  • βœ“Record discarded products.
  • βœ“See quantities.
  • βœ“Review dates.
  • βœ“Examine value.
  • βœ“Keep scrap associated with job.
PROD-33
Quality, Rework & Scrap

Scrap-sale proceeds cannot be connected to the job

Operational Challenge

Scrap may be sold, but the income needs to be visible separately from manufacturing costs.

ERPPWA Connected Solution

Enter scrap-sale proceeds in Job Incomes so the income remains tied to the relevant manufacturing job.

Key Business Gains:
  • βœ“Record realised income.
  • βœ“Keep job context.
  • βœ“Review income separately.
  • βœ“Use Finance posting.
  • βœ“Support financial analysis.
PROD-34
Cost, Finance & Finished Goods

Estimated manufacturing cost and actual cost are hard to compare

Operational Challenge

Production managers need to understand whether actual resources and expenses are exceeding the planned job.

ERPPWA Connected Solution

The Job Dashboard shows estimated and actual manufacturing costs with supporting material, process and expense details.

Key Business Gains:
  • βœ“See planned spending.
  • βœ“Review actual cost.
  • βœ“Investigate differences.
  • βœ“Include work inputs.
  • βœ“Improve cost visibility.
PROD-35
Cost, Finance & Finished Goods

Technician travel and inspection costs are not recorded against a job

Operational Challenge

Small but relevant job expenses can be forgotten in a product’s manufacturing cost.

ERPPWA Connected Solution

Add expenses directly in Job Expenses; they contribute to actual job manufacturing cost and post to Finance expense ledgers.

Key Business Gains:
  • βœ“Capture ancillary costs.
  • βœ“Associate expenses with job.
  • βœ“Update cost information.
  • βœ“Create finance records.
  • βœ“Avoid separate ledger re-entry.
PROD-36
Cost, Finance & Finished Goods

Job income and product profit are confused

Operational Challenge

Revenue from scrap sales or other job income is not the same as profit on a finished machine.

ERPPWA Connected Solution

Display Job Incomes and Expenses separately, compare estimated/actual manufacturing cost, and assess product profit in Sales reporting after sale.

Key Business Gains:
  • βœ“Separate income from cost.
  • βœ“Avoid premature margin claims.
  • βœ“Review job inflows.
  • βœ“Check manufacturing spend.
  • βœ“Use sales reports for profit.
PROD-37
Cost, Finance & Finished Goods

Finished items wait until the whole job is complete to enter inventory

Operational Challenge

A batch of 100 machines may produce 40 usable units before the remaining 60 are ready.

ERPPWA Connected Solution

Create partial Finished Goods vouchers during an open job; every partial voucher calculates manufacturing cost and updates Product Page pricing.

Key Business Gains:
  • βœ“Record partial output.
  • βœ“Keep the job open.
  • βœ“Update product pricing.
  • βœ“Connect output to inventory.
  • βœ“Continue remaining work.
PROD-38
Cost, Finance & Finished Goods

Finishing a batch should not always close the reusable job

Operational Challenge

A standard production job may be continued for another batch, so automatic permanent closure could interrupt work.

ERPPWA Connected Solution

Manage job status manually, subject to any enabled QC completion requirement, rather than automatically closing the job at the last Finished Goods voucher.

Key Business Gains:
  • βœ“Retain job flexibility.
  • βœ“Support another batch.
  • βœ“Keep QC rules available.
  • βœ“Avoid unintended closure.
  • βœ“Control lifecycle decisions.
PROD-39
Documents & Communication

Technical drawings and instructions are difficult to find

Operational Challenge

Operators often need specifications associated with an exact job or process, not a general file folder.

ERPPWA Connected Solution

Attach new or existing ERP documents to jobs and individual processes and use process instructions in the job workspace.

Key Business Gains:
  • βœ“Link drawings to work.
  • βœ“Search attachments.
  • βœ“Reuse existing files.
  • βœ“Share instructions.
  • βœ“Reduce misplaced references.
PROD-40
Documents & Communication

Drawing changes create confusion about which file is current

Operational Challenge

When engineering revises a drawing, workers need a practical way to distinguish it from the earlier attachment.

ERPPWA Connected Solution

Upload the new document and rename/tag the previous copy manually to clarify which version should be used.

Key Business Gains:
  • βœ“Retain old files.
  • βœ“Label revisions manually.
  • βœ“Attach current drawings.
  • βœ“Avoid claiming nonexistent automated versioning.
  • βœ“Keep documents job-linked.
PROD-41
Documents & Communication

Production discussions are lost in chat applications

Operational Challenge

A shop-floor correction or instruction may be difficult to trace back to the operation it concerned.

ERPPWA Connected Solution

Use process-level Task Messages with author/date history; a new message triggers a notification and can be read inside the job.

Key Business Gains:
  • βœ“Keep discussion by process.
  • βœ“Notify participants.
  • βœ“Record dates.
  • βœ“Preserve authors.
  • βœ“Review prior instructions.
πŸ› οΈ Tailor-Made Guarantee

Fully Customized ERP

Every manufacturing enterprise has distinct routing hierarchies, Job Card print layouts, and machine overhead formulas. With ERPPWA, our software adapts to your proven shop-floor operationsβ€”not the other way around. Our ERP is fully customized to fit your manufacturing operations.

  • βœ“Custom Job Card formats, barcode stickers & job travelers print layouts
  • βœ“Specialized multi-stage stage approval chains and scrap tolerance rules
  • βœ“Tailored machine electricity & overhead cost allocation formulas
🏒 Deployment Freedom

Private Cloud or 100% On-Premise

Enjoy complete architectural sovereignty. Host ERPPWA on our managed encrypted cloud for effortless multi-plant access, or deploy it 100% On-Premise on your local factory server for total data privacy and zero internet downtime dependency on your shop floor.

  • βœ“Encrypted Cloud with 99.99% uptime and automatic backups
  • βœ“100% On-Premise deployment on your factory LAN server
  • βœ“Native Progressive Web App (PWA) works seamlessly on shop-floor tablets
⚑ Architectural Comparison

Why ERPPWA Outperforms Traditional Legacy Other ERPs

Compare how our modern Progressive Web App architecture eliminates the rigid complexity, exorbitant AMC costs, and missing shop-floor mobile tools of old legacy software.

Manufacturing Capability ERPPWA Intelligent Platform Traditional Legacy Other ERPs
Multi-Level BOM & Process Routing βœ… Nested multi-level BOMs with scrap % & 1-click printable process sheets ❌ Rigid single-level BOMs or complex engineering add-on modules
Digital Job Cards & Department Tracking βœ… Live Department Job Tracker with operator work hours & mobile scan ❌ Paper clipboards and retroactive manual data entry
Job-Wise Shortage Calculation & Auto-PO βœ… Automated 'Required to Purchase Stock List' with 1-click PO generation ❌ Disconnected purchasing; frequent line-stopping material shortages
Serial Component Genealogy βœ… Embedded raw material serial and heat codes traced in master product ❌ Incomplete traceability; cannot isolate defective vendor batches
Subcontractor Delivery Notes & Scrap βœ… Process-wise outside delivery notes, shrinkage norms & labor billing ❌ Manual delivery challans with high unrecorded contractor scrap
Actual Landed Unit Costing βœ… Scientific formula: Used Materials + Process Expenses + Direct Labor ❌ Standard cost estimates only; hidden overhead costs eat profits
Quality Inspection & Rework Management βœ… Standardized QC Templates (Inward, Stage, PDI) & job rework tracking ❌ Verbal QC; reworked operator labor buried in general overhead
Predictive Delay Intelligence βœ… Job Intime, Possible Delay, and Delay reports alert days before deadline ❌ Reactive firefighting; delays discovered on promised delivery date
Scrap & Scrap Income Accounting βœ… Dedicated scrap weight logs & scrap sales revenue credited to job ledger ❌ Scraps quietly disposed off without formal ledger accounting
Accounting Ledger Synchronization βœ… 2-Way automated sync for production vouchers, stock journals & bills ❌ Clumsy manual XML export/import or complete disconnect
ERP Customization βœ… Fully customized Job Cards, routing sheets, and reports ❌ Rigid templates or expensive change requests
Deployment Flexibility βœ… Pure Cloud SaaS or 100% Private On-Premise Factory Server ❌ Rigid client-server desktop installs tethered to office LAN
❓ Got Questions?

Frequently Asked Questions

Find answers to common operational questions about Bills of Materials, Job Cards, subcontractor job work, actual costing, and ERPPWA implementation.

Yes. ERPPWA supports nested, multi-level Bills of Materials (BOM) for complex assemblies, sub-assemblies, semi-finished components, and raw materials. It accounts for component scrap percentages, operational process sequences, and pre-production unit cost estimations.

ERPPWA generates digital and printable Job Cards per employee, department, and process. Supervisors can monitor the live Job Tracking by Department dashboard to see which work orders are at cutting, machining, heat treatment, or final assembly with real-time percentage completion.

Yes. When a Job is scheduled, ERPPWA generates a 'Required to Purchase Stock List' comparing BOM requirements against current free store stock. It calculates the exact shortfall and creates Job-Wise Purchase Orders with pre-scheduled delivery dates in 1 click.

ERPPWA calculates actual cost using a true mathematical formula: Used Materials Cost + Direct Machine & Process Expenses + Operator Labor Hours = Actual Production Cost. It provides live variance analysis comparing standard BOM estimates to actual cost.

Yes. ERPPWA records the specific raw material heat codes, batch numbers, and component serial numbers used in each master finished product, ensuring full cradle-to-grave traceability for warranty audits.

ERPPWA manages outside processes with dedicated contractor Delivery Notes. It tracks sent materials, returned finished components, allowable process shrinkage, and contractor service billing with automatic reconciliation.

Yes. ERPPWA provides standardized QC Templates for inward raw materials, in-process stage inspection, and pre-dispatch final inspection (PDI). Rejected items can be routed into dedicated Rework Jobs or scrapped.

ERPPWA includes three predictive delay analytics reports: Job Intime Report, Job Possible Delay Report, and Job Delay Report. Supervisors receive automated alerts before milestone delivery dates breach, allowing proactive machine load rebalancing.

Yes. ERPPWA records generated scrap by job and logs scrap sales revenue directly against job ledger accounts, giving owners an accurate picture of net manufacturing yields and scrap recovery.

Yes. ERPPWA generates printable Job BOM documents detailing raw materials, component drawing references, cutting sizes, and process steps for shop floor operators.

Upon final QC clearance, ERPPWA performs a 1-click Finished Goods Inward entry, closing the Job, updating warehouse stock, assigning serial/batch barcodes, and posting final manufacturing journal entries.

Yes. Manufacturing vouchers, raw material consumption journals, finished goods inward vouchers, and contractor job work bills synchronize seamlessly with standard external accounting platforms and financial ledgers.

Request Personal ERP Consultation

Schedule Your Guided Production Module Demo

Experience how ERPPWA eliminates shop-floor delays, automates Job Cards, and calculates true actual unit cost.

πŸ’‘ Production Knowledgebase

Production Management ERP FAQs

Explore detailed answers to common operational questions regarding shop-floor execution, BOM adaptability, machine tracking, and unit costing.

Production management software connects manufacturing jobs, materials, processes, employees, machines, quality tasks and finished goods so teams can monitor production requirements and costs.

No. Users create production jobs separately because manufacturing-specific information may be needed. A job can be planned for combined demand from multiple Sales Orders for the same standard product.

Yes. A job begins with the Product Master BOM and process structure, but users can modify that job's BOM and processes without changing the original product setup.

Yes. A separately manufactured assembly can be managed as a subjob. When completed, its finished-product manufacturing cost is used when the assembly becomes material in the parent job.

The confirmed workflow uses process and materials visibility rather than automatic purchasing-date scheduling. Managers inspect upcoming process requirements and the job's Buy column, then initiate RFQs or POs for selected materials.

Yes. Select the relevant job BOM materials and quantities, then use the RFQ or PO generation actions with supplier and other required information.

Yes. Users can issue materials through the job's Pick function in multiple stages, creating material-issue (SRM) vouchers.

SRM is the material-issue voucher list, showing voucher numbers, dates, notes and amounts. SRMI is a product-level quantity, average-price and amount view. These are not separate subcontract delivery-note workflows.

GRN shows job-linked supplier Purchase Invoice/GRN vouchers. GR shows the goods-received product lines, quantities and related actions such as issuing material for production or rework.

Processes support One Time and Per Item rate types. The appropriate amount and process quantity are used alongside configured hours, labour and machine information to estimate and track manufacturing work costs.

Yes. Employees use a start/pause/continue timer in My Jobs. They cannot simply override their elapsed time by typing arbitrary hours.

Yes. With relevant permission, managers can mark processes On Hold, change priorities or reassign departments and employees.

Yes. Jobs can include externally performed processes and show associated DNO and DNI movements. Service charges can be entered through SPI, PI or Job Expenses and included in manufacturing cost.

Yes. It tracks rejected, rework and scrap quantities. Rework can be managed as an additional process with the related expenses included in manufacturing cost.

Yes, when the configurable QC completion restriction is enabled. It can also be disabled according to the company's workflow.

Yes. Machine details and hourly rates can be maintained and a machine can be selected for a process. Relevant hourly costs contribute to manufacturing cost.

No. It shows estimated and actual manufacturing costs, income and expenses. Product profit is assessed when the finished product is sold, through sales reporting.

Yes. Partial Finished Goods vouchers can be created while a job remains open, and each voucher updates the related Product Page pricing.

Yes. Users can attach job/process documents and send messages recorded with author/date history. New messages generate notifications, with the full message read in the job.

ERPPWA offers a 20-day free trial with self-service registration.

Request Personal ERP Consultation

Schedule Your Guided Production Module Demo

Experience how ERPPWA eliminates shop-floor delays, automates Job Cards, and calculates true actual unit cost.